The operating system for Solar, Grid-Forming BESS & H2
Asset condition, maintenance and project delivery assurance for Edify Energy's solar, battery storage and hybrid developments, with evidence-led grid compliance reviews.
Edify Energy portfolio context: Darlington Point, Riverina, Koorangie and Queensland hybrid developments. Preview condition readings, budgets and intervention outcomes are illustrative, not verified Edify operating results.
Ganymirra & Majors Creek 300MW/1200MWh Reverse DC-Coupled BESS
Operational
100
Koorangie 220kV AusNet Interface Harmonic Filter Bank
Operational
100
Smoky Creek & Guthrie Gap 600MW/2400MWh BESS & 720MWp Solar
Operational
100
Riverina BESS 1 Grid-Forming Megapack Bank A
Operational
100
0 critical assets flagged across the fleet
Capital DeliveryHybrid & BESS Delivery
Monitor the health, budget, and stage-gate hold points of Edify's flagship developments, from Smoky Creek & Guthrie's Gap to Ganymirra, Majors Creek, and Koorangie.
Smoky Creek & Guthrie Gap Solar + BESS (720MWp / 2,400MWh)
On Track
Smoky Creek & Guthrie Gap Solar + BESS
Budget$1850.0M
Progress38%
Flagship Central Queensland hybrid complex adjacent to Callide 275kV substation. Delivered with DT Infrastructure under the $3.2B portfolio financing facility.
Ganymirra & Majors Creek Hybrid Solar + BESS (360MWp / 1,200MWh)
At Risk
Ganymirra & Majors Creek Hybrid Complex
Budget$1350.0M
Progress44%
Co-located reverse DC-coupled solar (360MWp) and 4-hour grid-forming battery (300MW / 1,200MWh) south of Townsville, backed by CIS underwriting and Rio Tinto / CleanCo offtake.
Koorangie Energy Storage System (KESS) 185MW / 370MWh System Strength
On Track
Koorangie Energy Storage System
Budget$410.0M
Progress94%
185MW / 370MWh grid-forming Tesla Megapack BESS near Kerang, Victoria. Provides 300MVA of system strength to unlock Murray River REZ capacity under ARENA & VRET support.
Darlington Point Solar & Riverina BESS Thermal & Inverter Optimisation
On Track
Darlington Point Solar Farm
Budget$14.5M
Progress62%
Fleet life-extension program replacing high-cycle IGBT stacks across Darlington Point Solar Farm and upgrading coolant loop chillers on Riverina BESS 2.
Lansdown Green Hydrogen Facility Stage 1 (Townsville Eco-Precinct)
Planning
Lansdown Green Hydrogen & Solar Hub
Budget$245.0M
Progress22%
Green hydrogen production and export facility at Lansdown Eco-Industrial Precinct powered by dedicated behind-the-meter solar and battery storage.
Capital Plan (FY2026–28)Portfolio funding review
Darlington Point Solar Farm SMA Central Inverter IGBT Fleet Refurbishment
FY2026 · $4.6M
urgent
Darlington Point 330kV Main Transformer On-Load Tap Changer (OLTC) Overhaul
Gannawarra BESS DC Block Augmentation & Inverter Upgrade
FY2027 · $8.4M
urgent
Whitsunday, Hamilton & Hayman Tracker Slew-Drive Cyclone Hardening
FY2027 · $3.9M
high
The Edify Energy fleet & hybrid delivery scale AssetStack governs
NSW
Solar & Storage
Darlington Point and Riverina
QLD
Hybrid Delivery
Smoky Creek, Guthrie's Gap, Ganymirra and Majors Creek
VIC
Battery & Grid Services
Koorangie and Gannawarra
AUD
Capital & Renewal
Separate estimates, commitments and verified outcomes
National NEM Portfolio
Dispatchable Firm Green Energy
From the Riverina and Murray River REZ to North and Central Queensland. AssetStack unifies Edify Energy's utility-scale solar farms, grid-forming Megapack systems, and green hydrogen hubs.
Facility
Capacity
Type
Location
Description
Smoky Creek & Guthrie's Gap
720MWp / 2,400MWh
Hybrid Solar + 4hr BESS
Callide 275kV
Flagship Central Queensland clean energy complex adjacent to Callide Power Station, delivered with DT Infrastructure.
Ganymirra & Majors Creek
360MWp / 1,200MWh
Reverse DC-Coupled
Townsville QLD
Co-located hybrid solar and 4-hour grid-forming battery storage using reverse DC-coupled architecture.
Koorangie Energy Storage (KESS)
185MW / 370MWh
Grid-Forming BESS
VIC grid services
Battery storage connected to the AusNet network. Track grid-service evidence separately from installed MW and MWh; service benefits are not additional nameplate capacity.
Darlington Point Solar Farm
275MWac / 333MWp
Utility Solar PV
~1M Panels
Connected to TransGrid 330kV Darlington Point substation with NEXTracker TrueCapture and sheep agrisolar grazing.
Riverina & Darlington Point BESS
150MW / 300MWh
Grid-Forming BESS
RESS 1, 2 & DPESS
Three co-located Tesla Megapack facilities providing fast frequency response, SIPS support, and energy arbitrage.
Gannawarra Solar & Energy Storage
60MWp / 25MW / 50MWh
Solar & Battery Facilities
Kerang, VIC
Separate solar and battery facility identities at one physical site, with maintenance, commercial roles and integration evidence recorded independently.
The Operational Reality
Operating gigawatt fleets while assuring hybrid project delivery
Edify Energy develops and manages solar, storage and hybrid projects across NSW, Queensland and Victoria. The platform distinguishes operating facilities from development and construction packages, and development or asset-management responsibilities from ownership.
330kV & 275kV Main Step-Up Transformers: online DGA ethylene/acetylene monitoring to prevent catastrophic connection trips
Tesla Megapack 2XL & Powerpack BESS: cell ΔT thermal balancing, glycol chiller health, and state-of-health (SoH) tracking
SMA Central Inverters & NEXTracker rows: preventing IGBT thermal derating during 42°C Riverina and North QLD peaks
AEMO generator performance standards: commissioning hold-point evidence, model validation and project-specific network obligations
Smoky Creek, Guthrie's Gap, Ganymirra & Majors Creek: governing stage-gate EPC delivery and CIS milestones
Core Platform
Everything in one place
Purpose-built for Edify Energy's solar PV, grid-forming battery energy storage, green hydrogen, and major hybrid EPC delivery programs.
BESS & Inverter Predictive AI
Review recorded transformer DGA, battery cooling and inverter condition signals to prioritise engineering investigation. Predictions require current data and human review.
Drone Thermography & Digital Twin
Review uploaded solar array, battery compound and substation inspection imagery. Link findings to equipment and maintenance actions; specialist thermography interpretation requires engineering verification.
10-Year Augmentation & Repowering
Compare battery augmentation, inverter renewal and solar repowering scenarios using recorded asset condition, useful-life assumptions and capital estimates.
AEMO GPS & System Strength
Register generator performance standards, commissioning hold points, protection tests and network obligations, with responsible owners and supporting evidence for independent review.
Verified Savings Ledger
Quantify every avoided forced outage and preserved FCAS / cap-event dispatch interval with auditable engineering evidence for lenders and investment partners.
Hybrid EPC Assurance
Stage-gate governance, SLA tracking, and executive risk escalation for Smoky Creek, Guthrie's Gap, Ganymirra, Majors Creek, and Koorangie.
Global Hierarchy
Standardised Asset Taxonomy
AssetStack organizes Edify Energy's entire fleet into a clean, traversable hierarchy. Drill down from state REZ hubs to individual solar farms and BESS compounds, down to 330kV transformers, Megapack banks, and inverter skids.
ISO 55000 aligned classification
Parent-child cost rollup
Equipment-linked sensor records
Live Asset Topology
Legend
Operational
Degraded
Critical
Maintenance
💡 Click + / − on group nodes to collapse · Click cards for details · Drag to pan · Scroll to zoom
Reverse DC-Coupled & Grid-Forming Ready
Built for the complexity of Edify's 1GW+ / 3.6GWh Hybrid Wave
From reverse DC-coupled grid-forming inverters at Ganymirra and Majors Creek to 2,400MWh of 4-hour storage at Smoky Creek and Guthrie's Gap: AssetStack gives Edify Energy a single assurance backbone from EPC stage-gates to NEM dispatch.
Reverse DC-Coupled Inverter & BESS Telemetry
AEMO NER S5.2.5 R2 & Hold Point Assurance
Aerial Thermography & Substation Digital Twins
The Value
What it means for Edify Energy
Capability is only worth what it changes on the ground. Here's the operational impact.
Executive Dashboards
Verifiable Business Outcomes
Track portfolio performance in real-time with executive-level metrics that roll up from every station, asset, and work order.
Solar & BESS
Edify asset context
Connect solar arrays, trackers, battery systems and substations to facility identities, condition evidence and maintenance records.
$17.6M+
Recorded preview outcomes
Illustrative ledger totals are not verified Edify savings. Actual outcomes require cost baselines, intervention evidence and independent verification.
Human review
Inspection & commissioning evidence
Link solar inspection findings, BESS condition records and commissioning submissions to accountable owners and reviewers.
Evidence-led
Grid & environmental obligations
Track facility-specific generator performance standards, network commitments, safety and environmental approvals without implying automatic regulatory compliance.
Intervention assurance
Evidence-led solar and BESS interventions
Illustrative Edify operating workflows, not claims of realised savings. Record baseline costs, intervention costs and independent verification before reporting an outcome.
Darlington Point transformer condition review
Review recorded dissolved-gas trends, assign an engineering owner and document isolation prerequisites before approving transformer maintenance.
DGA evidence
Illustrative workflow
Koorangie grid-service assurance
Link grid-forming performance evidence, network obligations and independent review records without treating service capability as additional installed capacity.
Review required
Illustrative workflow
Riverina battery cooling intervention
Investigate coolant and cell-temperature anomalies against OEM limits before agreeing maintenance windows with the relevant facility and market counterparties.
Thermal review
Illustrative workflow
Daydream solar inspection findings
Associate inspection images and verified electrical findings with the affected solar assets, corrective work orders and post-repair checks.
Field evidence
Illustrative workflow
Gannawarra battery renewal assessment
Compare recorded degradation, warranty conditions and renewal assumptions before recommending battery module replacement or augmentation.
SoH evidence
Illustrative workflow
Queensland solar storm readiness
Review tracker condition, stow-test evidence, site access and weather-related work restrictions before storm-season maintenance.
Stow readiness
Illustrative workflow
Financial Intelligence
Justify every dollar to lenders & the board
Capital Plan (FY2026–28) · Portfolio funding review
See approved capital plan
AssetStack models Edify's 10-year BESS augmentation, inverter refurbishment, and solar repowering program across Balanced, Must-Do, and Premium funding strategies.
Scenario modelling for Smoky Creek & Ganymirra hybrid ramp-up
Speed to Value
Import assets through a controlled workflow
Import existing Excel, CSV, or legacy-system exports through a structured mapping and validation workflow before adding them to the asset hierarchy.
Drag-and-drop bulk CSV/Excel imports
AI-assisted column mapping and data cleaning
Validated hierarchy generation from flat files
AssetMind AI
Command your fleet with natural language
Don't click through endless menus. Just ask AssetMind. Our domain-specific AI agent understands solar PV, grid-forming BESS, and AEMO compliance workflows.
Review Darlington Point transformer condition and draft a maintenance recommendation with the required isolation and network approvals.
Illustrative response: review the latest transformer readings and propose a maintenance action for engineering approval. Battery availability, network constraints and isolation permissions must be confirmed by authorised operators; no dispatch or switching has been performed.
Enterprise Grade
Built for Critical Infrastructure
Bank-grade security, offline field capabilities, and deep system integrations ensure AssetStack meets the rigorous standards of national utility providers.
Security Controls
Encryption at rest and in transit, role-based access control, and comprehensive audit logging for operational actions.
Offline Field Mode
Full offline capabilities for remote stations. Technicians can complete inspections and sync automatically when back online.
SCADA Integration
Import sensor readings through configured ingestion endpoints or CSV workflows. Connections to Edify's SCADA, historian and ERP systems require separate integration setup.
Regulatory Auditing
Track Edify facility-specific AEMO and network obligations, electrical safety requirements, environmental approvals and EPC evidence for regulatory and lender reviews.
See it live with Edify Energy's operating context
The platform preview is pre-loaded with Edify's solar farms, grid-forming Megapack BESS sites, hybrid projects, and AEMO GPS obligations.
Selected Edify NSW, QLD and VIC portfolio context; illustrative operational records
Ready to see Edify Energy OS in action?
The platform preview covers Edify Energy's solar farms, Megapack BESS facilities, hybrid construction packages, and the full AssetStack operating model.