Prepared exclusively for Edify Energy

The operating system for Solar, Grid-Forming BESS & H2

Asset condition, maintenance and project delivery assurance for Edify Energy's solar, battery storage and hybrid developments, with evidence-led grid compliance reviews.

Edify Energy portfolio context: Darlington Point, Riverina, Koorangie and Queensland hybrid developments. Preview condition readings, budgets and intervention outcomes are illustrative, not verified Edify operating results.

Aerial view of utility-scale solar generation and battery storage
Asset CoverageSolar & BESS
Delivery ControlsHybrid assurance
Intervention OutcomesEvidence-led
Edify Energy Fleet HealthCurrent

Darlington Point BESS (DPESS) 25MW/50MWh Bank

Operational

100

Koorangie 185MW/370MWh Synchronous Grid-Forming Core

Operational

100

Lansdown Stage 1 PEM Electrolyser Train (Townsville H2)

Operational

100

Ganymirra & Majors Creek 300MW/1200MWh Reverse DC-Coupled BESS

Operational

100

Koorangie 220kV AusNet Interface Harmonic Filter Bank

Operational

100

Smoky Creek & Guthrie Gap 600MW/2400MWh BESS & 720MWp Solar

Operational

100

Riverina BESS 1 Grid-Forming Megapack Bank A

Operational

100

0 critical assets flagged across the fleet

Capital DeliveryHybrid & BESS Delivery

Monitor the health, budget, and stage-gate hold points of Edify's flagship developments, from Smoky Creek & Guthrie's Gap to Ganymirra, Majors Creek, and Koorangie.

Smoky Creek & Guthrie Gap Solar + BESS (720MWp / 2,400MWh)

On Track

Smoky Creek & Guthrie Gap Solar + BESS

Budget$1850.0M
Progress38%

Flagship Central Queensland hybrid complex adjacent to Callide 275kV substation. Delivered with DT Infrastructure under the $3.2B portfolio financing facility.

Ganymirra & Majors Creek Hybrid Solar + BESS (360MWp / 1,200MWh)

At Risk

Ganymirra & Majors Creek Hybrid Complex

Budget$1350.0M
Progress44%

Co-located reverse DC-coupled solar (360MWp) and 4-hour grid-forming battery (300MW / 1,200MWh) south of Townsville, backed by CIS underwriting and Rio Tinto / CleanCo offtake.

Koorangie Energy Storage System (KESS) 185MW / 370MWh System Strength

On Track

Koorangie Energy Storage System

Budget$410.0M
Progress94%

185MW / 370MWh grid-forming Tesla Megapack BESS near Kerang, Victoria. Provides 300MVA of system strength to unlock Murray River REZ capacity under ARENA & VRET support.

Darlington Point Solar & Riverina BESS Thermal & Inverter Optimisation

On Track

Darlington Point Solar Farm

Budget$14.5M
Progress62%

Fleet life-extension program replacing high-cycle IGBT stacks across Darlington Point Solar Farm and upgrading coolant loop chillers on Riverina BESS 2.

Lansdown Green Hydrogen Facility Stage 1 (Townsville Eco-Precinct)

Planning

Lansdown Green Hydrogen & Solar Hub

Budget$245.0M
Progress22%

Green hydrogen production and export facility at Lansdown Eco-Industrial Precinct powered by dedicated behind-the-meter solar and battery storage.

Capital Plan (FY2026–28)Portfolio funding review

Darlington Point Solar Farm SMA Central Inverter IGBT Fleet Refurbishment

FY2026 · $4.6M

urgent

Darlington Point 330kV Main Transformer On-Load Tap Changer (OLTC) Overhaul

FY2026 · $2.1M

urgent

Riverina BESS 1 & 2 Secondary Glycol Chiller Loop Redundancy Upgrade

FY2027 · $3.1M

high

Gannawarra BESS DC Block Augmentation & Inverter Upgrade

FY2027 · $8.4M

urgent

Whitsunday, Hamilton & Hayman Tracker Slew-Drive Cyclone Hardening

FY2027 · $3.9M

high
The Edify Energy fleet & hybrid delivery scale AssetStack governs
NSW

Solar & Storage

Darlington Point and Riverina

QLD

Hybrid Delivery

Smoky Creek, Guthrie's Gap, Ganymirra and Majors Creek

VIC

Battery & Grid Services

Koorangie and Gannawarra

AUD

Capital & Renewal

Separate estimates, commitments and verified outcomes

National NEM Portfolio

Dispatchable Firm Green Energy

From the Riverina and Murray River REZ to North and Central Queensland. AssetStack unifies Edify Energy's utility-scale solar farms, grid-forming Megapack systems, and green hydrogen hubs.

FacilityCapacityTypeLocationDescription
Smoky Creek & Guthrie's Gap720MWp / 2,400MWhHybrid Solar + 4hr BESSCallide 275kVFlagship Central Queensland clean energy complex adjacent to Callide Power Station, delivered with DT Infrastructure.
Ganymirra & Majors Creek360MWp / 1,200MWhReverse DC-CoupledTownsville QLDCo-located hybrid solar and 4-hour grid-forming battery storage using reverse DC-coupled architecture.
Koorangie Energy Storage (KESS)185MW / 370MWhGrid-Forming BESSVIC grid servicesBattery storage connected to the AusNet network. Track grid-service evidence separately from installed MW and MWh; service benefits are not additional nameplate capacity.
Darlington Point Solar Farm275MWac / 333MWpUtility Solar PV~1M PanelsConnected to TransGrid 330kV Darlington Point substation with NEXTracker TrueCapture and sheep agrisolar grazing.
Riverina & Darlington Point BESS150MW / 300MWhGrid-Forming BESSRESS 1, 2 & DPESSThree co-located Tesla Megapack facilities providing fast frequency response, SIPS support, and energy arbitrage.
Gannawarra Solar & Energy Storage60MWp / 25MW / 50MWhSolar & Battery FacilitiesKerang, VICSeparate solar and battery facility identities at one physical site, with maintenance, commercial roles and integration evidence recorded independently.
The Operational Reality

Operating gigawatt fleets while assuring hybrid project delivery

Edify Energy develops and manages solar, storage and hybrid projects across NSW, Queensland and Victoria. The platform distinguishes operating facilities from development and construction packages, and development or asset-management responsibilities from ownership.

  • 330kV & 275kV Main Step-Up Transformers: online DGA ethylene/acetylene monitoring to prevent catastrophic connection trips
  • Tesla Megapack 2XL & Powerpack BESS: cell ΔT thermal balancing, glycol chiller health, and state-of-health (SoH) tracking
  • SMA Central Inverters & NEXTracker rows: preventing IGBT thermal derating during 42°C Riverina and North QLD peaks
  • AEMO generator performance standards: commissioning hold-point evidence, model validation and project-specific network obligations
  • Smoky Creek, Guthrie's Gap, Ganymirra & Majors Creek: governing stage-gate EPC delivery and CIS milestones
Core Platform

Everything in one place

Purpose-built for Edify Energy's solar PV, grid-forming battery energy storage, green hydrogen, and major hybrid EPC delivery programs.

BESS & Inverter Predictive AI

Review recorded transformer DGA, battery cooling and inverter condition signals to prioritise engineering investigation. Predictions require current data and human review.

Drone Thermography & Digital Twin

Review uploaded solar array, battery compound and substation inspection imagery. Link findings to equipment and maintenance actions; specialist thermography interpretation requires engineering verification.

10-Year Augmentation & Repowering

Compare battery augmentation, inverter renewal and solar repowering scenarios using recorded asset condition, useful-life assumptions and capital estimates.

AEMO GPS & System Strength

Register generator performance standards, commissioning hold points, protection tests and network obligations, with responsible owners and supporting evidence for independent review.

Verified Savings Ledger

Quantify every avoided forced outage and preserved FCAS / cap-event dispatch interval with auditable engineering evidence for lenders and investment partners.

Hybrid EPC Assurance

Stage-gate governance, SLA tracking, and executive risk escalation for Smoky Creek, Guthrie's Gap, Ganymirra, Majors Creek, and Koorangie.

Global Hierarchy

Standardised Asset Taxonomy

AssetStack organizes Edify Energy's entire fleet into a clean, traversable hierarchy. Drill down from state REZ hubs to individual solar farms and BESS compounds, down to 330kV transformers, Megapack banks, and inverter skids.

  • ISO 55000 aligned classification
  • Parent-child cost rollup
  • Equipment-linked sensor records
Live Asset Topology
All Assets
15 assets
−
Darlington Point Solar Farm
3 assets
−
Daydream, Hayman & Whitsunday Solar Hub
2 assets
−
Gannawarra Solar Farm & BESS
2 assets
−
Ganymirra & Majors Creek Hybrid Complex
1 asset
−
Koorangie Energy Storage System
2 assets
−
Lansdown Green Hydrogen & Solar Hub
1 asset
−
Riverina & Darlington Point BESS
3 assets
−
Smoky Creek & Guthrie Gap Solar + BESS
1 asset
−
330kV Substation Yard
1 asset
−
Solar Field Zone A
1 asset
−
Solar Field Zone B
1 asset
−
Daydream Sector
1 asset
−
Whitsunday Sector
1 asset
−
Gannawarra BESS Enclosure
1 asset
−
Gannawarra Solar Field
1 asset
−
Hybrid DC Coupling Yard
1 asset
−
220kV Switchyard
1 asset
−
KESS Main Battery Yard
1 asset
−
Hydrogen Process Hall
1 asset
−
DPESS Compound
1 asset
−
RESS 1 Compound
1 asset
−
RESS 2 Compound
1 asset
−
Callide 275kV Interface
1 asset
−
DPSF Main Step-Up Transformer TX-01 (330/33kV)
transformer · 85%
DPSF Single-Axis Tracker Array Zone A (120,000 Modules)
solar tracker · 100%
DPSF Central Inverter Skid INV-Block-14
inverter · 85%
Daydream Solar Farm 180MWp PV Array & Substation
solar array · 80%
Whitsunday & Hamilton 138MWp Tracker & Inverter Fleet
solar tracker · 65%
Gannawarra 25MW/50MWh Powerpack Battery System
battery system · 65%
Gannawarra 50MWac Solar Array & Inverter Station
solar array · 80%
Ganymirra & Majors Creek 300MW/1200MWh Reverse DC-Coupled BESS
battery system · 100%
Koorangie 220kV AusNet Interface Harmonic Filter Bank
harmonic filter · 100%
Koorangie 185MW/370MWh Synchronous Grid-Forming Core
battery system · 100%
Lansdown Stage 1 PEM Electrolyser Train (Townsville H2)
electrolyser · 100%
Darlington Point BESS (DPESS) 25MW/50MWh Bank
battery system · 100%
Riverina BESS 1 Grid-Forming Megapack Bank A
battery system · 100%
Riverina BESS 2 Megapack Thermal Coolant Loop C3
battery cooling · 50%
Smoky Creek & Guthrie Gap 600MW/2400MWh BESS & 720MWp Solar
hybrid energy system · 100%

Legend

Operational
Degraded
Critical
Maintenance

💡 Click + / − on group nodes to collapse · Click cards for details · Drag to pan · Scroll to zoom

Reverse DC-Coupled & Grid-Forming Ready

Built for the complexity of Edify's 1GW+ / 3.6GWh Hybrid Wave

From reverse DC-coupled grid-forming inverters at Ganymirra and Majors Creek to 2,400MWh of 4-hour storage at Smoky Creek and Guthrie's Gap: AssetStack gives Edify Energy a single assurance backbone from EPC stage-gates to NEM dispatch.

  • Reverse DC-Coupled Inverter & BESS Telemetry
  • AEMO NER S5.2.5 R2 & Hold Point Assurance
  • Aerial Thermography & Substation Digital Twins
The Value

What it means for Edify Energy

Capability is only worth what it changes on the ground. Here's the operational impact.

Executive Dashboards

Verifiable Business Outcomes

Track portfolio performance in real-time with executive-level metrics that roll up from every station, asset, and work order.

Solar & BESS

Edify asset context

Connect solar arrays, trackers, battery systems and substations to facility identities, condition evidence and maintenance records.

$17.6M+

Recorded preview outcomes

Illustrative ledger totals are not verified Edify savings. Actual outcomes require cost baselines, intervention evidence and independent verification.

Human review

Inspection & commissioning evidence

Link solar inspection findings, BESS condition records and commissioning submissions to accountable owners and reviewers.

Evidence-led

Grid & environmental obligations

Track facility-specific generator performance standards, network commitments, safety and environmental approvals without implying automatic regulatory compliance.

Intervention assurance

Evidence-led solar and BESS interventions

Illustrative Edify operating workflows, not claims of realised savings. Record baseline costs, intervention costs and independent verification before reporting an outcome.

Darlington Point transformer condition review

Review recorded dissolved-gas trends, assign an engineering owner and document isolation prerequisites before approving transformer maintenance.

DGA evidenceIllustrative workflow

Koorangie grid-service assurance

Link grid-forming performance evidence, network obligations and independent review records without treating service capability as additional installed capacity.

Review requiredIllustrative workflow

Riverina battery cooling intervention

Investigate coolant and cell-temperature anomalies against OEM limits before agreeing maintenance windows with the relevant facility and market counterparties.

Thermal reviewIllustrative workflow

Daydream solar inspection findings

Associate inspection images and verified electrical findings with the affected solar assets, corrective work orders and post-repair checks.

Field evidenceIllustrative workflow

Gannawarra battery renewal assessment

Compare recorded degradation, warranty conditions and renewal assumptions before recommending battery module replacement or augmentation.

SoH evidenceIllustrative workflow

Queensland solar storm readiness

Review tracker condition, stow-test evidence, site access and weather-related work restrictions before storm-season maintenance.

Stow readinessIllustrative workflow
Financial Intelligence

Justify every dollar to lenders & the board

Capital Plan (FY2026–28) · Portfolio funding review

See approved capital plan

AssetStack models Edify's 10-year BESS augmentation, inverter refurbishment, and solar repowering program across Balanced, Must-Do, and Premium funding strategies.

  • BESS DC-block augmentation & cell degradation schedules
  • Risk-adjusted capital prioritisation for project sponsors, investors and lenders
  • Condition-based inverter & 330kV OLTC replacement triggers
  • Scenario modelling for Smoky Creek & Ganymirra hybrid ramp-up
Speed to Value

Import assets through a controlled workflow

Import existing Excel, CSV, or legacy-system exports through a structured mapping and validation workflow before adding them to the asset hierarchy.

  • Drag-and-drop bulk CSV/Excel imports
  • AI-assisted column mapping and data cleaning
  • Validated hierarchy generation from flat files
AssetMind AI

Command your fleet with natural language

Don't click through endless menus. Just ask AssetMind. Our domain-specific AI agent understands solar PV, grid-forming BESS, and AEMO compliance workflows.

Review Darlington Point transformer condition and draft a maintenance recommendation with the required isolation and network approvals.
Illustrative response: review the latest transformer readings and propose a maintenance action for engineering approval. Battery availability, network constraints and isolation permissions must be confirmed by authorised operators; no dispatch or switching has been performed.
Enterprise Grade

Built for Critical Infrastructure

Bank-grade security, offline field capabilities, and deep system integrations ensure AssetStack meets the rigorous standards of national utility providers.

Security Controls

Encryption at rest and in transit, role-based access control, and comprehensive audit logging for operational actions.

Offline Field Mode

Full offline capabilities for remote stations. Technicians can complete inspections and sync automatically when back online.

SCADA Integration

Import sensor readings through configured ingestion endpoints or CSV workflows. Connections to Edify's SCADA, historian and ERP systems require separate integration setup.

Regulatory Auditing

Track Edify facility-specific AEMO and network obligations, electrical safety requirements, environmental approvals and EPC evidence for regulatory and lender reviews.

See it live with Edify Energy's operating context

The platform preview is pre-loaded with Edify's solar farms, grid-forming Megapack BESS sites, hybrid projects, and AEMO GPS obligations.

Selected Edify NSW, QLD and VIC portfolio context; illustrative operational records

Ready to see Edify Energy OS in action?

The platform preview covers Edify Energy's solar farms, Megapack BESS facilities, hybrid construction packages, and the full AssetStack operating model.

Questions? hello@assetstack.com

AssetStackPrepared exclusively for Edify Energy Pty Ltd