AssetStackAssetStack

Total Assets

15

Operational

67%2.5%

Fleet Health

87%1.2%

At Risk

1

Pending Tasks

13

Fleet condition distribution

15 assets scored · 7% below 60

CriticalPoorFairGoodExcellent02468

Fleet Overview

By Status

By Risk

Operational (10)
Degraded (5)

15

Total

87%

Health

1

At Risk

Risk by Location

8 locations
Riverina & Darlington Point BESS
Gannawarra Solar Farm & BESS
Darlington Point Solar Farm
Daydream, Hayman & Whitsunday Solar Hub
Koorangie Energy Storage System
Ganymirra & Majors Creek Hybrid Complex
Smoky Creek & Guthrie Gap Solar + BESS
Lansdown Green Hydrogen & Solar Hub
low
medium
high
critical

Fleet Health Trend & Prediction

Day 1Day 2Day 3Day 4Day 5Day 6Day 7Day 8Day 9Day 10Day 11Day 12Day 13Day 140255075100
Actual
Predicted
Threshold

Alerts

4
Acknowledge
Resolve

DPSF 330kV TX-01 Dissolved Gas Analysis (DGA) Ethylene Spike

about 4 hours ago

Online DGA monitor detected ethylene (C2H4) rising from 42 ppm to 98 ppm over 14 days during peak afternoon solar export (268 MWac).

Acknowledge
Resolve

Riverina BESS 2 Coolant Loop C3 ΔT Cell Spread Exceedance

about 4 hours ago

Megapack Bank C3 cell temperature delta reached 6.8°C during FCAS Raise 6-second market dispatch event. Glycol flow rate 18% below nominal.

Acknowledge
Resolve

Darlington Point INV-Block-14 IGBT Phase B Thermal Derating

about 4 hours ago

SMA Sunny Central 4600 UP Inverter Block 14 derated output by 22% at 39°C ambient due to IGBT heatsink thermal resistance degradation.

Acknowledge
Resolve

Whitsunday Solar Farm Row 42-58 NEXTracker Slew Gear Current High

about 4 hours ago

Motor drive current on 16 tracker rows in Whitsunday Sector exceeded 4.8A during morning stow recovery.

Equipment Fleet

solar array

Gannawarra 50MWac Solar Array & Inverter Station

80
RUL9 yrs
Risk
low
Value:
Gannawarra Solar Farm & BESS
battery cooling

Riverina BESS 2 Megapack Thermal Coolant Loop C3

50
RUL8 yrs
Risk
high
Value:
Riverina & Darlington Point BESS
battery system

Ganymirra & Majors Creek 300MW/1200MWh Reverse DC-Coupled BESS

100
RUL19 yrs
Risk
low
Value:
Ganymirra & Majors Creek Hybrid Complex
battery system

Darlington Point BESS (DPESS) 25MW/50MWh Bank

100
RUL17 yrs
Risk
low
Value:
Riverina & Darlington Point BESS
harmonic filter

Koorangie 220kV AusNet Interface Harmonic Filter Bank

100
RUL19 yrs
Risk
low
Value:
Koorangie Energy Storage System
battery system

Gannawarra 25MW/50MWh Powerpack Battery System

65
RUL8 yrs
Risk
medium
Value:
Gannawarra Solar Farm & BESS
battery system

Koorangie 185MW/370MWh Synchronous Grid-Forming Core

100
RUL19 yrs
Risk
low
Value:
Koorangie Energy Storage System
solar tracker

DPSF Single-Axis Tracker Array Zone A (120,000 Modules)

100
RUL13 yrs
Risk
low
Value:
Darlington Point Solar Farm
solar tracker

Whitsunday & Hamilton 138MWp Tracker & Inverter Fleet

65
RUL8 yrs
Risk
medium
Value:
Daydream, Hayman & Whitsunday Solar Hub
hybrid energy system

Smoky Creek & Guthrie Gap 600MW/2400MWh BESS & 720MWp Solar

100
RUL20 yrs
Risk
low
Value:
Smoky Creek & Guthrie Gap Solar + BESS
electrolyser

Lansdown Stage 1 PEM Electrolyser Train (Townsville H2)

100
RUL19 yrs
Risk
low
Value:
Lansdown Green Hydrogen & Solar Hub
battery system

Riverina BESS 1 Grid-Forming Megapack Bank A

100
RUL17 yrs
Risk
low
Value:
Riverina & Darlington Point BESS
solar array

Daydream Solar Farm 180MWp PV Array & Substation

80
RUL10 yrs
Risk
low
Value:
Daydream, Hayman & Whitsunday Solar Hub
transformer

DPSF Main Step-Up Transformer TX-01 (330/33kV)

85
RUL24 yrs
Risk
low
Value:
Darlington Point Solar Farm
inverter

DPSF Central Inverter Skid INV-Block-14

85
RUL11 yrs
Risk
low
Value:
Darlington Point Solar Farm