AssetStackAssetStack

Maintenance Tasks

9 total tasks • 8 AI recommended

9

Scheduled

0

Overdue

0

Completed

8

AI Recommended

🤖
urgent
In Progress
AI 94%
CRITICAL

DPSF 330kV TX-01 Oil Sampling & OLTC Diverter Inspection

Perform ASTM D3612 dissolved gas sampling and inspect OLTC diverter switch contacts during scheduled night outage.

DPSF Main Step-Up Transformer TX-01 (330/33kV)
Oct 16, 2026
6h estimated
Sarah Jenkins
Est. $18,500
⚠️
urgent
Scheduled
AI 96%
CRITICAL

Riverina BESS 2 Coolant Loop C3 Proportional Valve & Strainer Flush

Isolate Megapack Bank C3 during midday solar trough, flush 50-micron glycol strainer, and recalibrate thermal flow actuator.

Riverina BESS 2 Megapack Thermal Coolant Loop C3
Oct 17, 2026
4h estimated
Marcus Chen
Est. $9,200
🤖
high
Scheduled
AI 88%

AI-Recommended Predictive Maintenance - Whitsunday & Hamilton 138MWp Tracker & Inverter Fleet

Automated task generated based on: Failure Probability: 37.0%, RUL: 51 days, Health: 68%. Estimated failure cost: $37,000. Recommended maintenance cost: $7,500.

Whitsunday & Hamilton 138MWp Tracker & Inverter Fleet
Oct 22, 2026
4h estimated
Maintenance Technician

AI Suggested Parts:

General Maintenance Kit
Est. $7,500
🤖
high
Scheduled
AI 91%

Darlington Point INV-Block-14 IGBT Phase B Heatsink & Fan Overhaul

Replace Phase B IGBT thermal interface material and high-speed blower cartridge between 20:00 and 04:00 AEST.

DPSF Central Inverter Skid INV-Block-14
Oct 19, 2026
5h estimated
Sarah Jenkins
Est. $14,800
🤖
medium
Scheduled
AI 78%

AI-Recommended Predictive Maintenance - Gannawarra 25MW/50MWh Powerpack Battery System

Automated task generated based on: Failure Probability: 29.0%, RUL: 123 days, Health: 73%. Estimated failure cost: $29,000. Recommended maintenance cost: $7,500.

Gannawarra 25MW/50MWh Powerpack Battery System
Oct 29, 2026
4h estimated
Maintenance Technician

AI Suggested Parts:

General Maintenance Kit
Est. $7,500
🤖
urgent
Scheduled
AI 96%

[AssetMind Auto] Wattle Hill Hybrid BESS Cell Drift & Degradation Remediation

AssetMind detected abnormal battery degradation / cell drift on Wattle Hill Hybrid BESS (Wattle Hill, Tas): Cell drift on Resistance growth: +1.0% (4.6σ) | Resistance growth: 20.9% | Cell voltage spread: 45mV.

Unknown Equipment
Oct 16, 2026
4h estimated
Marcus Sterling (BMS & Cell Diagnostics)
Est. $4,500
🤖
urgent
Scheduled
AI 96%

[AUTO-TRIGGER] Imminent BESS Failure Prevention: Darlington Point BESS

Automated battery degradation model trigger on Darlington Point BESS. Breaches: Cell voltage spread 68mV (>=60mV) | DC resistance growth +27.4% (>=25%).

Unknown Equipment
Oct 16, 2026
4h estimated
Unassigned
Est. $4,800
🤖
high
Scheduled
AI 96%

[AssetMind Auto] Riverina BESS Cell Drift & Degradation Remediation

AssetMind detected abnormal battery degradation / cell drift on Riverina BESS (Riverina, NSW): Degradation 2.61 pts/yr vs 2 benchmark.

Unknown Equipment
Oct 16, 2026
4h estimated
Elena Vance (HV BESS Lead)
Est. $4,500
🔍
high
In Progress
CRITICAL

Koorangie BESS Hold Point 4 Grid-Forming Fault Ride-Through Test

Execute AEMO / AusNet R2 illustrative inertia and phase-angle jump verification across all 185MW Megapack inverters.

Koorangie 185MW/370MWh Synchronous Grid-Forming Core
Oct 20, 2026
12h estimated
Marcus Chen
Est. $42,000