AssetStackAssetStack

Manager View

Manager Dashboard

Overview of team performance, tasks & fleet health

0%

Completion Rate

0/13 tasks

0

Overdue Tasks

Require attention

87

Avg Health Score

0 critical assets

2/4

Available Techs

1 active work orders

Task Types

PredictiveCorrectiveInspection036912

Task Status Overview

Scheduled11
In Progress2

Cost Summary (Last 30 days)

Estimated Costs

$67,300

Actual Costs

$0

Variance

-$67,300

Team Performance

1

BESS High-Voltage Field Crew A

available
0/1 92 14h

0%

completion

2

Liam Kerr (BESS Thermal & HV Specialist)

available
0/1 91 10h

0%

completion

3

Elena Vance (HV BESS Lead)

busy
0/2 96 32h

0%

completion

4

Marcus Sterling (BMS & Cell Diagnostics)

busy
0/2 94 34h

0%

completion

Active Alerts (4)

2 Critical
2 Warning

DPSF 330kV TX-01 Dissolved Gas Analysis (DGA) Ethylene Spike

Online DGA monitor detected ethylene (C2H4) rising from 42 ppm to 98 ppm over 14 days during peak afternoon solar export (268 MWac).

DPSF Main Step-Up Transformer TX-01 (330/33kV) Oct 15, 1:06 AM
critical

Riverina BESS 2 Coolant Loop C3 ΔT Cell Spread Exceedance

Megapack Bank C3 cell temperature delta reached 6.8°C during FCAS Raise 6-second market dispatch event. Glycol flow rate 18% below nominal.

Riverina BESS 2 Megapack Thermal Coolant Loop C3 Oct 15, 1:06 AM
critical

Darlington Point INV-Block-14 IGBT Phase B Thermal Derating

SMA Sunny Central 4600 UP Inverter Block 14 derated output by 22% at 39°C ambient due to IGBT heatsink thermal resistance degradation.

DPSF Central Inverter Skid INV-Block-14 Oct 15, 1:06 AM
warning

Whitsunday Solar Farm Row 42-58 NEXTracker Slew Gear Current High

Motor drive current on 16 tracker rows in Whitsunday Sector exceeded 4.8A during morning stow recovery.

Whitsunday & Hamilton 138MWp Tracker & Inverter Fleet Oct 15, 1:06 AM
warning